Procedures and Design Criteria for Storm Water Management Systems and Soil Erosion and Sedimentation Control Program
Livingston County, MichiganDrain CommissionerProcedures and Design Criteria for Storm Water Management Systems and Soil Erosion and Sedimentation Control Program

Procedures and Design Criteria for Storm Water Management Systems and Soil Erosion and Sedimentation Control Program

The Livingston County storm water design standards represents the culmination of a two year long effort on behalf of the Drain Commissioner to revise drainage standards first adopted in 1981. This document can be used as a general guide, however it may change periodically to adapt to changing circumstances within the County. Please check with the Drain Commissioner's office before making decisions based on this document.
 
Or click on the links below to access a particular section.

Introduction

 

Part A: Procedures and Design Criteria for Stormwater Management Systems

Section 1 - Procedures for Plan Submission and Review
Section 2 - Design Criteria for Stormwater Management Systems

 

Appendices

Appendix A: Section 433 Agreement Package
Appendix B: Preliminary Plat or Plan Checklist
Appendix C: Fee Schedule (Refer to Stormwater Drainage Review Fees at top of page)