Procedures

Procedures

Procedures and Design Criteria for Storm Water Management Systems

and Soil Erosion and Sedimentation Control Program

The Livingston County storm water design standards represents the culmination of a two year long effort on behalf of the Drain Commissioner to revise drainage standards first adopted in 1981. This document can be used as a general guide, however it may change periodically to adapt to changing circumstances within the County. Please check with the Drain Commissioner's office before making decisions based on this document.
 
Or click on the links below to access a particular section.

Introduction
 
 

Appendices