Environmental Health Division Fee Schedule
Livingston County, MichiganHealth DepartmentEnvironmental HealthEnvironmental Health Division Fee Schedule

Environmental Health Division Fee Schedule

Fee Schedule – Effective March 20, 2015

Environmental Health Services
Soil Evaluation per Parcel (3 boring max. location)

Single Family 300
Soil Evaluation / Individual Soil Boring Single Family 100
Per building site commercial 325
Per building soil boring commercial 175
Alternative Technology Vacant Land Evaluation/prelim. review 500


Sewage Disposal Permits
Residential
New Construction Single Family

350
New Construction Single Family w/engineer plans 550
Replacement Septic Permit Single Family* 275
Replacement Septic Permit Single Family w/engineer plans* 450
Single Family Septic Tank only 150
Alternative Technology Operating Permit 30
Permit Renewal 50% of permit fee
Commercial
    Commercial Sewage Permit <1000 gpd w/o engineer plans*

624
    Commercial Sewage Permit <1000 gpd with engineer plans*
735
    Commercial Sewage Permit >1000 gpd <10,000 gpd*
840
    Commercial Sewage Permit >10,000 gpd*
1,050
    Commercial Septic Tank only
150


Re-inspection Fee – when construction does not comply w/approved permit 100
Plan Review Resubmission Fee 150
*For Replacement Permits add appropriate Soil Evaluation Fee to Permit Total


Water Supply Permits
    (Fees do not include any charges for water quality analysis)

Single Family/Residential Test Well/Irrigation Well/Vertical Closed Loop Geothermal 275
Public Water Supply:
    Type III Well
300
    Type II/Transient
350
    Type II/Nontransient
400
Certified Operator Training 75
Commercial Process/Irrigation Well 275
Test Well for Commercial Projects
300
Permit Renewal 50% of permit fee


Field Related Services
Hydrogeologic Plan Review646
Subdivision Plat Review:
    Onsite Water Supply & Onsite Sewage Disposal

1,094 + 100/lot
    Onsite Sewage Disposal Only
753 + 100/lot
    Subdivision Plat Review (Onsite Water Supply Only)
572 + 23/lot
    Subdivision Plat Review (Public Water & Sewer System)
189
    Recertification of Previously Approved Subdivision
432
    Community Septic Vacant Land Review <10,000 gpd
777
    Community Septic Vacant Land Review >10,000 gpd
1,166
Septic Installers License – New 210
Yearly Renewal79
    Test Retake Fee
53
    Homeowner Test Fee
53
Hearing before the Health Officer 100
Hearing before the Board of Appeals 275
Public Assemblage Permit 200
Field/Office Review for Additions/Remodel 75
Horizontal Closed Loop Geothermal 75


Community Health & Safety Programs
Department of Human Services:
    Partial Evaluation (Water and/or Sewage Disposal)

200 + lab
    Full Evaluation (Well and/or Septic)
300 + lab
    Full Evaluation (Municipal Water and Sewer)
200
    Resample Water
35 + lab
    Children Campgrounds - Large
400 + lab
    Plan Review for New DHS
357
    Children Campgrounds - Small
300 + lab
Public Pools and Campgrounds:
    Temporary Campground Permit
210
    Public Swimming Pool (Initial Opening Inspection – New Construction)
263
    Public Pools & Spas (Annual Inspection)*
200
    Public Pool/Spa Re-open Inspection
100
    Public Campground Fee
210
    Public Campground Reinspection Fee
100
Public Assemblage Permit
200
Mobile Home Park Plan Review 1,030
    Mobile Home Park Re-inspection Fee
100
Cemetery Plat Review 131 plan review + 200 soil evaluation
*$75 for each additional pool/spa at the same address


Body Art

Body Art Plan Review and major remodeling of existing establishment (including consultation, construction, pre-opening, and 30 day follow-up inspection)
600
Re-inspection Fee – Follow up of Critical Violations 100
Enforcement Hearings 150 + follow-up inspection costs
Remodeling or Renovating of Existing Body Art Establishment (Plan Review) 275
Change of Ownership 200
Temporary Body Art Establishment license/inspection and plan review
    Completed application received 10 days or more prior to event
350
    Completed application received less than 10 days prior to event
425
    Operating w/o a License/Inspection
500


Food Service
Food Service Plan Review and major remodeling of existing establishment*
    Seating Capacity      0 – 100
1,365
    Seating Capacity  101 – 200
1,643
    Seating Capacity  201 – over
1,926
Mobile & STFU Plan Review (NEW) 500
Mobile & STFU Plan Review (Change of Ownership) 250
Fixed Change of Ownership/Use250
Remodeling or Renovating of Existing Food Service Establishments (Plan Review) 50% of new
Re-inspection Fee 100
Compliance/Informal/Formal Enforcement Hearing 100/200/300 +follow up inspection costs
MDARD Requested Well & Septic Inspections 238
    Mobile Food Establishment (1) (2)
205 + State Fee
    Mobile Food Establishment Commissary (1) (2)
205 + State Fee
Temporary Food Service Establishment
    Completed application received 5 days or more prior to event

125 + State Fee
Completed application received less than 5 days prior to event 150 + State Fee
Fee for operating without a license 200 + State Fee
Special Transitory Food unit  (1) (2) 112 + State Fee
    STFU - Inspection Fee
90
    Pre-Operational Inspection
90
Annual Food Service Sanitation License (1) (2) (3)
Seating Capacity    0 – 25 627 + State Fee
Seating Capacity  26 – 50 680 + State Fee
Seating Capacity  51 – 75 820 + State Fee
Seating Capacity  76 – 100 898 + State Fee
Seating Capacity  101 – over 1,010 +State Fee
Schools (1) (2)
    Full Service Kitchen

1,010 +State Fee
    Satellite/Serving Kitchen
627+ State Fee
Fraternal, Civic, Non-profit and Religious organizations 627+ State Fee
1. Fee 50% of annual rate after 10/31 for applications for new owner or establishment.
2. Penalty fee (% of food service license fee) for license renewal after April 30th.
    May   1 - 7
10% penalty
    May 8 - 14
20% penalty
    May 15 - 21
30% penalty
    May 22 - 28
40% penalty
    May 29 - June 4
50% penalty
    After June 5
75% penalty + admin. action referral
3. If the food service establishment operates less than 6 months/year the license fee will be ½ the regular fee as stated in the fee schedule.
*Fee includes consultation and inspections for construction, pre-opening, opening and operating.